01 September 2015
Site Update
  • Panoramic view of the project
    Panoramic view of the project
  • Zone 5: Concrete works at Block F: F4, F5 & F6 (1st and 2nd floor slab)
    Zone 5: Concrete works at Block F: F4, F5 & F6 (1st and 2nd floor slab)
  • Zone 3: Climbing formwork for faster concrete pouring of vertical elements
    Zone 3: Climbing formwork for faster concrete pouring of vertical elements
  • Zone 3: Pouring of slab in Block A
    Zone 3: Pouring of slab in Block A
  • Zone 3: Concrete works in Block A (8th floor slab)
    Zone 3: Concrete works in Block A (8th floor slab)
  • Zone 2: Concrete Works at Block C (1st floor slab)
    Zone 2: Concrete Works at Block C (1st floor slab)
  • Zone 1: Concrete Works at Block F: F1, F2 & F3 (2nd floor slab)
    Zone 1: Concrete Works at Block F: F1, F2 & F3 (2nd floor slab)
  • Zone 4: Excavation works following the removal of archeological findings
    Zone 4: Excavation works following the removal of archeological findings